Here's a snapshot of the recent projects we've successfully undertaken.  For more information on how we tackled specific installations, click here to read our project newsletters

 

YEAR PROJECT NAME SCOPE /DESCRIPTION OF PROJECT PERFORMANCE CLIENT CONTACT
2011 Barnard-Baker-Sar Streets Stormwater Renewal, Wellington 165m of 450 OD PE Gravity stormwater @ 30% grade down a steep vegetated gully by HDD; 45m of opencut pipe installation, 3 no. new manholes and associated drainage works. Client was overwhelmed that job was undertaken to completion given the challenging conditions. Capacity Infrastructure Services
Tom Jolly (GHD)
04 570 0431
2011 Bedford Road, SH39, Hamilton 23m of 1200NB RCBJ pipe beneath State Highway by pipejacking; Annulus Grouting of new and existing piped road crossings. Works successfully completed to the satisfaction of client, additional works given. Transfield Services
Steve Uffindell
07 846 9713
2011 Otumanga Wastewater Pumping Station, Upgrade & Rising Main Duplication, Tauranga Duplication of an existing Sewer Pumping Station and associated pipeworks and mechanical installations. Work completed to requirements. Tauranga City Council
Neil Watkins (OPUS)
2010 Southern Pipeline, Tauranga 1763m of 710 OD PE Sewer Rising Main by HDD; 23m of 1200NB RCBJ pipe beneath busy intersection by Pipejacking; grouting of all annuluses. Client very pelased with success in achieving installations and having a minimal impact on the local population.

Downer

John Morrison

027 215 7860

2009 Birkdale Catchment C14 Area C Sewer Upgrade, Birkdale, North Shore City 949m 560 OD PE and  531m 180 OD PE Gravity Sewer pipelines by HDD; 3 no. deep 2.0m dia. Manholes (12m - 34m deep); 8 no. 1.05m - 1.2m dia. Manholes (1.2m - 6.5m deep); 90m of driven timber post 'n plank retained access. Successful outcome for a lengthy trenchless installation using NZ's first locally owned MAXI Drill for a SINGLE shot installation nearing 1km. North Shore City Council
Dietmar Londer (SKM)
021 378 824
2008 Henwood Road Pump Station Diversion, Manukau, Auckland 354m 315 OD PE Gravity Sewer pipeline across SH20 between Henwood Road and Tidal Road Pump Stations.  Included 1 no. 1.2 dia x 7m deep manhole. Successfully completed to client's requirements and timeframe. Manuaku Water Ltd
Dick Bevalaar (MWL)
09 262 5745/ Peter Evans (HGC)
09 917 5000
2008 Public Stormwater Installations 72-82 Pupuke Road, Birkenhead, North Shore City Approx. 600m of various sized PE (250 OD - 710 OD) gravity stormwater installations by HDD. Satisfactorily completed in very testing conditions - tight spaces and in time of very inclement weather. Fulton Hogan
Ben Fowler
027 466 0298
Barnard-Sar Streets, Wellington Birkdale, Auckland INFRATRAIN_014.jpg

To view some footage from a recent project we completed click on the video to the right.


 

 
 

About Us

As a long standing member of the "no-dig" community, Smythe Contractors endeavours to reach new levels of service to our customers through positive relationships and a strong collaborative approach - always discussing the best solution - from the design phase through preparation, through to the pipe installation.
Find out more

Contact Us

0800_bk.jpg 07 827 5925

Mobile: 027 476 3417

Email: simon@smythecon.com